CORE Construction
Projects / DPW 24217

BSU Morrison Center

Boise, Idaho ยท Owner: Wes Mains ยท Closeout Due: 2026-08-30
Closeout Package With Exceptions
โ† All trade partners

Buss Mechanical

Plumbing, fixtures, waste/vent, domestic water, floor cleanouts

Preview portal โ†—
Point of Contact
Emily Pinkly
Contact Email
emilypinkly@bussmechanical.com
Phone
(208) 555-0110
Spec Sections
01 77 00, 22 05 00, 22 40 00
Drawing References
P2.01, P2.02, P2.03, P2.04

Required Closeout Items (10)

RequirementSpecDueFilesStatusActions
O&M Manuals
O&M Manuals required per spec section 22 05 00.
22 05 001969-12-11
๐Ÿ“Ž O_M_Manuals.pdf
Satisfied
Warranties
Warranties required per spec section 22 05 00.
22 05 001969-12-18
๐Ÿ“Ž Warranties.pdf
Satisfied
Product Data
Product Data required per spec section 22 05 00.
22 05 001969-12-25
๐Ÿ“Ž Product_Data.pdf
Satisfied
As-Built Markups
As-Built Markups required per spec section 22 05 00.
22 05 001970-01-01
๐Ÿ“Ž As_Built_Markups.pdf
Uploaded
Testing Reports
Testing Reports required per spec section 22 05 00.
22 05 001970-01-08
๐Ÿ“Ž Testing_Reports.pdf
Pending CORE Review
Inspection Reports
Inspection Reports required per spec section 22 05 00.
22 05 001970-01-15NoneOpen
Training Documentation
Training Documentation required per spec section 22 05 00.
22 05 001970-01-22NoneDue Soon
Attic Stock / Spare Parts
Attic Stock / Spare Parts required per spec section 22 05 00.
22 05 001970-01-29NonePast Due
Final Cleaning Documentation
Final Cleaning Documentation required per spec section 22 05 00.
22 05 001970-02-05NoneRejected / Needs Revision
Commissioning Documentation
Commissioning Documentation required per spec section 22 05 00.
22 05 001970-02-12
๐Ÿ“Ž Commissioning_Documentation.pdf
Satisfied