CORE Construction
Jordan Lee
ABC Electric
Project

BSU Morrison Center

Boise, Idaho · DPW 24217

Your scope: Electrical rough-in, trim, panels, devices, lighting controls
Spec sections: 26 05 00, 26 24 16
Upload the requested closeout documents below. After upload, CORE will review and either approve or return with correction notes.
O&M Manuals
Spec 26 05 00 · Due 1969-12-11 · File type: PDF
  • 📎 O_M_Manuals.pdf2026-06-15
Satisfied
Warranties
Spec 26 05 00 · Due 1969-12-18 · File type: PDF
  • 📎 Warranties.pdf2026-06-15
Satisfied
Product Data
Spec 26 05 00 · Due 1969-12-25 · File type: PDF
  • 📎 Product_Data.pdf2026-06-15
Satisfied
As-Built Markups
Spec 26 05 00 · Due 1970-01-01 · File type: PDF/DWG
  • 📎 As_Built_Markups.pdf2026-06-15
Uploaded
Testing Reports
Spec 26 05 00 · Due 1970-01-08 · File type: PDF
  • 📎 Testing_Reports.pdf2026-06-15
Pending CORE Review
Inspection Reports
Spec 26 05 00 · Due 1970-01-15 · File type: PDF
Open
Training Documentation
Spec 26 05 00 · Due 1970-01-22 · File type: PDF/Video
Due Soon
Attic Stock / Spare Parts
Spec 26 05 00 · Due 1970-01-29 · File type: PDF
Past Due
Final Cleaning Documentation
Spec 26 05 00 · Due 1970-02-05 · File type: PDF
Rejected / Needs Revision
Commissioning Documentation
Spec 26 05 00 · Due 1970-02-12 · File type: PDF
  • 📎 Commissioning_Documentation.pdf2026-06-15
Satisfied